how the IFCW™ works

Floodwall erection - Verical posts

In the first step of actual IFCW™ erection, vertical parting supports are aligned and anchor bolts are loosely installed into anchors in the foundation. The bolts pass through the embeds and tie into the anchors located in the concrete foundation. In the event of a flood, a working crew of three people can install 1200 square feet of the IFCW™ in two hours.