flood proofing with the Invisible flood control wall

An industrial flood proofing closure, Shelby, Ohio

A large industrial firm in Shelby, Ohio expanded their fabrication center on property located within the 100-year floodplain of the Black Fork River. To enable construction for this growing business, the owners were required to secure a proven method of flood protection to acquire flood insurance.

An industrial flood proofing closure, Shelby, OhioThe facility service door openings in the concrete foundation were fitted with the Invisible Flood Control Wall™ elements. This is a low cost effort to design into new building plans. For existing structures, minor rework of the surrounding concrete is necessary. The cost of concrete work and installation of the IFCW™ components compared to flood loss, business relocation or massive flood control structures, is negligible.

Flood Control America has now installed dozens of flood proofing projects in the United States in locations ranging from private homes and educational institutions to factories and warehouses.